YANGZHOU ECONOMIC DEVELOPMENT ZONE(YZEDZ)

ENGLISH VERSION           CHINESE(GB) VERSION            CHINESE(BIG5) VERSION

We are looking forward to cooperate with you!


reddot.gif (908 bytes)Geographic Location
             1.Brief Introduction to Yangzhou
             2.Brief Introduction to YZEDZ
             3.Glance at YZEDZ

reddot.gif (908 bytes)Environment
            1.Nature Environment
            2.Environment Protection

reddot.gif (908 bytes)Planning Area

reddot.gif (908 bytes)Infratructure in yzedz
           1.Water Supply
           2.Electricity Supply
           3.Gas Supply
           4.Heat Supply
           5.Communications
           6.Road Facilities
           7.Rain and Waste Water Drain

reddot.gif (908 bytes)Adaministrative Agent

reddot.gif (908 bytes)Labour Source

reddot.gif (908 bytes)Forms of Investment

reddot.gif (908 bytes)Procedures of Investment

reddot.gif (908 bytes)Special Policy
           1.Taxation
           2.Land Use
           3.Factory Buildings for Lease

reddot.gif (908 bytes)Projects

  

  
Factory building for lease

1.Purchase and Lease of Standard Factory Buildings in YZEDZ.

The investors who have run enterprises in YEDZ may apply for purchase or lease of standard factory buildings.The purchasing price is $ 200 or so per square metre of floorage, which is applicable for the year of 1996. In addition to the purchasing price, purchasers need to pay a small amount of service charge for notarization, transaction registration, and etc. .

2.Characteristics of Standard Factory Buildings in YZEDZ.

The existing standard factory buildings in YEDZ are of multispan, castin-situ concrete intcgral construction.The concrete live floor load is designed for 660pa. Each of the storeys covers the surface of 3014.61m². The building is a 3-span complex, 89.1m long and no more than 4m high. Each of the factory buildings consists of offices,warehouse, toilet and generator room and is equipped with load elevators and stairways at both ends. The basement with the surface of 381m² is designed as the generator room for central air conditioning system. The factory building has been connected with the water-supply system and power-supply system and the plant arca is well provided with the drainage system and a spacious parking lot.